Newly formed Government, after the 7th Parliamentary election, has developed National Action Plan of Government of Mongolia to be implemented in 2016-2020 in accordance with the the Mongolian Sustainable Development strategy until 2030, MPP action plan, civil society organizations, international contracts and public opinion.
The following plan included 90 percent of Mongolian People`s Party action plan which won the 2016 Parliamentary Election and it will be implemented after approved by the State Great Khural.
The Government has submitted to implement following policies in construction and urban planning sector:
- Widen the scope for mortgage loan by easing requirements and implementing different types of loan programs
- Implement "Affordable housing" national program and develop integrated policy with the aim to supply the housing needs
- Update normative document system in accordance with international standards and create environment to use international normative documents
- Develop general development project of Mongolian settlement in accordance with the systems of region, group and village
- Improve the legal framework for land use and ownership and create integrated policy and system
- Map Mongolian territory and create geodetic networks
- Create legal framework to develop Ulaanbaatar city
- Implement "Street" and "Cycling road" sub-programs in accordance with General Plan on the Development of Ulaanbaatar city
- Increase green facilities of Ulaanbaatar city and aimag centers by three times
- Upgrade buildings and constructions of Ulaanbaatar city and other biggest cities in scope of urban development policy. Reduce air pollution by implementing ger district re-planning program
- Use tunnel system in new apartments to be built in biggest cities and residential areas
- Implement policy to develop production of construction materials directed at reducing the cost of construction, extending the period of construction industry, decreasing the weight of construction and reducing heat loss while improving the fire resistance
- Update statistics of earthquake frequency and reflect it to the construction planning in order to improve durability and reliability of buildings
- Develop and implement state general policy on public utilities in accordance with the general urban development plan
- Plan the drinking water system of new apartments separately and reuse gray water in accordance with international standards. Develop policy to use gray water to irrigate green facilities.
- Intensify reform of waste water treatment plants of UB and other biggest cities with foreign and domestic investments in accordance with the general urban development plan
- Use water treated at the Water Treatment Plant and soil water for industrial technology demand
- Improve wireless internet access and provide opportunities to use it in recreational areas and libraries
- Increase water flow of Tuul, Selbe and Dund rivers and create cozy environment alongside of rivers
- Double parking lots by building parking lots at b1 floors of towns and public service centers
- Complete construction of engineering networks in Selbe and Bayankhoshuu sub-centers
Newly formed Government, after the 7th Parliamentary election, has developed National Action Plan of Government of Mongolia to be implemented in 2016-2020 in accordance with the the Mongolian Sustainable Development strategy until 2030, MPP action plan, civil society organizations, international contracts and public opinion.
The following plan included 90 percent of Mongolian People`s Party action plan which won the 2016 Parliamentary Election and it will be implemented after approved by the State Great Khural.
The Government has submitted to implement following policies in construction and urban planning sector:
- Widen the scope for mortgage loan by easing requirements and implementing different types of loan programs
- Implement "Affordable housing" national program and develop integrated policy with the aim to supply the housing needs
- Update normative document system in accordance with international standards and create environment to use international normative documents
- Develop general development project of Mongolian settlement in accordance with the systems of region, group and village
- Improve the legal framework for land use and ownership and create integrated policy and system
- Map Mongolian territory and create geodetic networks
- Create legal framework to develop Ulaanbaatar city
- Implement "Street" and "Cycling road" sub-programs in accordance with General Plan on the Development of Ulaanbaatar city
- Increase green facilities of Ulaanbaatar city and aimag centers by three times
- Upgrade buildings and constructions of Ulaanbaatar city and other biggest cities in scope of urban development policy. Reduce air pollution by implementing ger district re-planning program
- Use tunnel system in new apartments to be built in biggest cities and residential areas
- Implement policy to develop production of construction materials directed at reducing the cost of construction, extending the period of construction industry, decreasing the weight of construction and reducing heat loss while improving the fire resistance
- Update statistics of earthquake frequency and reflect it to the construction planning in order to improve durability and reliability of buildings
- Develop and implement state general policy on public utilities in accordance with the general urban development plan
- Plan the drinking water system of new apartments separately and reuse gray water in accordance with international standards. Develop policy to use gray water to irrigate green facilities.
- Intensify reform of waste water treatment plants of UB and other biggest cities with foreign and domestic investments in accordance with the general urban development plan
- Use water treated at the Water Treatment Plant and soil water for industrial technology demand
- Improve wireless internet access and provide opportunities to use it in recreational areas and libraries
- Increase water flow of Tuul, Selbe and Dund rivers and create cozy environment alongside of rivers
- Double parking lots by building parking lots at b1 floors of towns and public service centers
- Complete construction of engineering networks in Selbe and Bayankhoshuu sub-centers